China launches emergency response for dual typhoons

China Saturday launched a medium-level emergency response plan to brace for the upcoming dual typhoons.

The State Flood Control and Drought Relief Headquarters launched a level III emergency response plan for the two typhoons set to hit Taiwan and Fujian this weekend.

Nesat, the ninth typhoon this year, is expected to make landfall in Taiwan Saturday and might land in the form of a typhoon or strong tropical storm in Fujian early Sunday.

The tenth typhoon is expected to hit central and northern Fujian late Sunday or early Monday.

Downpours are forecast in eastern part of south China, east China and Shandong Province, and the biggest rainfall in Fujian could reach 500 millimeters.

China has a four-level emergency response mechanism to deal with droughts and floods, with the first-level to deal with the most serious cases and the fourth-level to prepare for the least serious cases.

Under a level III emergency response plan, the office must report to the State Council within two hours and send a work team to the disaster zone within 24 hours.

The State Flood Control and Drought Relief Headquarters urged local governments to prepare for the typhoons with timely warning, safety checks and effective flood drainage measures.

10 die, 1 missing in northwest China flood

Ten people died and another remained missing after a flood hit northwest China’s Shaanxi Province, local authorities said Saturday.

Heavy rain hit Yulin City in northern Shaanxi from Tuesday night and caused floods in a number of areas.

More than 71,300 people were forced to evacuate, the provincial flood control headquarters said.

The disaster disrupted water and power supplies and telecommunications, destroyed infrastructure, and caused waterlogging in worst-hit Suide and Zizhou counties.

It has inflicted direct economic losses of nearly 1.7 billion yuan ($250 million).

By Saturday, the provincial government has allocated 50 million yuan to fight the flood. Yulin flood control headquarters distributed 5,000 shovels, 30,000 plastic bags and 15 power generators. Bottled water, instant noodles, steamed buns and disinfectant were also distributed.

So far, water and power supplies have been resumed in most parts of the county seats of Suide and Zizhou.

In Suide, governmental workers and local residents have spent three days removing sludge as thick as one meter.

Sections of two railway lines that were damaged by the flood resumed traffic, after 190 trains services had been canceled.

On Thursday, China’s second-longest river, the Yellow River, saw its first flood peak of the year.

The Yellow River Flood Control and Drought Relief Headquarters warned the provinces of Shanxi, Shaanxi, Henan and Shandong to be alert to the peak flow.

Shaolin Temple prepares ‘Great Meeting’

The first “Great Meeting Open to All” will be held at the Shaolin Temple from July 29 to Aug 4 in Dengfeng, Henan province.

A kung fu practitioner smashes bricks using one hand in Luoyang, Henan province, early this Month. XU JUNWEN/CHINA DAILY 

The 1,500-year-old temple will welcome kung fu masters and enthusiasts from home and abroad to share their skills and views on kung fu.

Shi Yongxin, the abbot of Shaolin Temple, came up with the idea of holding the “Great Meeting Open to All” in August 2016, said Zou Xiang, website manager for Shaolin Temple.

The meeting welcomes people of any social status and identity who will be treated equally through diverse forms of cultural exchanges, including Chan (Zen Buddhism), martial arts and medicine, Zou said.

The events date back to the late 4th century, according to historical records.

“Besides the martial arts, Chan and medicinal culture are regarded as the essence of Shaolin culture, and the contests involving the traditional 72 Shaolin kung fu arts can also be seen during the seven-day event,” Zou said.

In addition, many foreign disciples are welcome to join in events such as the lamp transmission ceremony, and take part in the “Shaolin Temple and the Northern Buddhist” academic seminar.

 

Press release: Attorney General helps record number of victims and families get justice

New statistics released today show the Attorney General’s Office has helped more victims and their families get justice than ever before, after 141 criminals had their sentences increased under the Unduly Lenient Sentence (ULS) scheme in 2016.

The ULS scheme allows victims of crime, prosecutors and members of the public to ask for certain sentences to be reviewed. The Attorney or Solicitor General then asks the Court of Appeal to review the sentence to have it increased if they believe the Court made an error in sentencing.

32 criminals, including an arsonist, someone carrying a firearm and 2 men found guilty of child neglect, all had their community sentence quashed and replaced with an immediate custodial sentence. Of these, 17 sex offenders who originally escaped prison are now serving time behind bars.

1 rapist and 1 attempted murderer had their determinate sentence replaced with a life sentence and now can only be released with permission from the Parole Board.

The Attorney General Jeremy Wright QC MP said:

“The Unduly Lenient Sentence scheme allows victims of crime, their families and the public to challenge sentences that they believe are too low, and last year we saw a record number of sentences increased.

“A sentencing exercise is not an exact science and in the vast majority of cases, judges get it right. The scheme is available to ensure that the Solicitor General and I can independently review those cases where there may have been an error in the sentencing decision.”

From 8 August, the scheme will cover an additional 19 terror-related offences including supporting extremist organisations, encouraging acts of terror or failing to disclose information about a terrorist attack. This extension is a first step to extending the scheme even further.

In 2016, 837 referrals were received by the Attorney General’s Office, a 17% increase from the previous year. The Attorney and Solicitor General referred 190 cases to the Court of Appeal that they thought needed looking at again, compared to 135 in 2015.

Of the 141 offenders who had their sentences increased, these related to crimes in the following categories:

Sex Offences 41
Grievous Bodily Harm with intent 19
Robbery 16
Firearms 11
Drugs 8
Burglary 7
Kidnapping 6
Manslaughter 6
False Imprisonment 6
Perverting the Course of Justice 4
Blackmail 3
Child Neglect / Cruelty 3
Arson 2
Death By Dangerous Driving 2
Conspiracy to cause explosions 2
Causing or allowing the death of a vulnerable adult 2
Attempted Murder 1
Murder 1
Threats to kill 1

141 cases resulting in sentence increases is a small proportion of the 80,000 Crown Court cases heard each year, but the ULS scheme is there to allow adjustment of those sentences where an increase is warranted.

The scheme was brought about after the public outcry that happened after the 1986 Ealing Vicarage rape case where 21 year old Jill Saward was brutally raped by a gang of robbers at her father’s vicarage.

Press release: Universal broadband to reach all parts of the UK

Homes and businesses from all parts of the UK are set to benefit from universal high speed broadband, the UK Government announced today.

BT has put forward an offer to voluntarily provide this service across the country, which would largely be delivered by Openreach. The offer has been received after the government committed to introduce a Universal Service Obligation (USO) through regulation to give every home and business in the UK the right to request a high speed connection of at least 10 Megabits per second (Mbps). That’s the speed that will meet the typical needs of a family for them to be able to stream films, carry out video conferencing and browse the web at the same time.

The BT proposal would mean many premises will receive substantially more than 10Mbps – homes and businesses are also expected receive connections more quickly than could be delivered under a regulatory approach. The Government will now consider this offer alongside a consultation on the regulatory USO – which is being launched today.

Secretary of State for Wales Alun Cairns said:

The UK Government is committed to ensuring the UK is leading the way in broadband provision. Successful broadband partnerships are creating a lasting legacy in Wales, which will play a key role in the future prosperity of our communities. The Government will now consider the proposals carefully to ensure the final decision provides the best outcomes for the people of Wales.

Culture Secretary Karen Bradley said:

The government is taking action to ensure that people everywhere in the UK can get a decent broadband connection as soon as possible. We warmly welcome BT’s offer and now will look at whether this or a regulatory approach works better for homes and businesses.

Whichever of the two approaches we go with in the end, the driving force behind our decision making will be making sure we get the best deal for consumers.

The communications regulator, Ofcom, has advised that 10Mbps, with quality requirements to limit delays and support uploading content as well as downloading it, meeting the needs of a typical household. It will also provide improved connectivity for many small businesses. A regulatory USO would provide a safety net, meaning that fast and reliable broadband was available to everyone, regardless of where they lived. Our consultation opening today will outline detailed proposals for how this new right to request a connection would work in practice.

This will help Government take a decision on the best way to get better broadband in hard to reach areas. No decision has been taken, and the Government will carefully weigh the merits of the two approaches. Unlike under a regulatory USO, the proposal from BT is to proactively build the necessary network infrastructure to connect the majority of households and businesses rather than wait for this to be done on request.

It is also proposed that BT would fund this investment and recover its costs through the charges for products providing access to its local access networks. The approach to recovering these costs will be considered in Ofcom’s current wholesale local access review.

BT Chief Executive Gavin Patterson said:

We are pleased to make a voluntary offer to deliver the Government’s goal for universal broadband access at minimum speeds of 10Mbps.

This would involve an estimated investment of £450m – £600m depending on the final technology solution.

This investment will reinforce the UK’s status as the leading digital economy in the G20. We already expect 95% of homes and businesses to have access to superfast broadband speeds of 24Mbps or faster by the end of 2017. Our latest initiative aims to ensure that all UK premises can get faster broadband, even in the hardest to reach parts of the UK.

The Government will now work with BT over the coming months to develop the proposal – which, if it is accepted, will be legally-binding. The Government will make a decision following its consultation on the regulatory USO.

Notes to editors:

  1. BT proposes to use a range of technologies to deliver this, including fibre to the cabinet and fibre to the home.
  2. It proposes to use fixed broadband technologies to take the UK’s 10Mbps fixed coverage to 99 per cent. It expects to complete the build of this fixed network by either December 2021 or December 2022 depending on the mix of technologies used, some of which are subject to trial and industry consultation.
  3. However, BT plans to launch the fixed wireless service before then so that the UK will have 10Mbps coverage to around 99% by the end of 2020. Fixed wireless will be made available at an affordable price for hard to reach premises.
  4. All of these technologies will come with quality standards including a minimum 1Mbps upload speeds, and requirements to minimise delays from contention and latency.
  5. The number of premises that will only have satellite as an option is expected to be 0.3% by the end of 2022.
  6. Today, over 93 per cent of UK homes and businesses can already get superfast broadband (24 Mbps+), and as a direct result of the Government’s Superfast Broadband Programme, this will increase to 95 per cent by the end of this year.