LCQ22: Defaulted works carried out by Buildings Department

     Following is a question by the Hon Andrew Lam and a written reply by the Secretary for Development, Ms Bernadette Linn, in the Legislative Council today (November 18):
      
Question:
 
     Provisions such as sections 26 (Dangerous buildings), 26A (Defective buildings), 28 (Drainage) and 30B (Obligation on owners to carry out prescribed inspection and prescribed repair in respect of buildings) of the Buildings Ordinance (Cap. 123) stipulate that where buildings are dangerous or out of repair and the owners have failed to comply with a statutory order within the specified time, the Building Authority (i.e. the Director of Buildings) may arrange for government contractors to carry out the defaulted works and then recover the cost of these works, together with supervision charges, from the owners under section 33 of the Ordinance. In this connection, will the Government inform this Council:
      
(1) of the number of cases in which the Buildings Department exercised its power under the Buildings Ordinance (Cap. 123) to carry out defaulted works in each of the past five years, with a breakdown by (i) reason (e.g. owners failing to comply with orders upon the expiry of the time limit, emergency situations posing imminent danger, owners being unable or refusing to organise the works, etc.) and (ii) type of works (e.g. repair of spalling on external walls/structural elements, repair of common drainage, clearance of dangerous buildings/unauthorised building works, mandatory building inspection/window inspection);
 
(2) of the specific administrative procedures currently in place for handling defaulted works (including the procedures, timeline and time required from the initiation of action to recovery of sums);
 
(3) of the total amount involved in defaulted works in each of the past five years; and the number of cases in which the amounts (including the actual cost of the works, additional supervision charges and interest) have been successfully recovered, the amount involved and its percentage in the total receivable amount; and
 
(4) of the number of cases of defaulted works for which the amounts have not yet been recovered or are overdue to date, the amount involved, the longest period of default, and the number of buildings among them on which an encumbrance has been imposed?
 
Reply:
 
President,
 
     In respect of dilapidated or dangerous buildings and defective drainage systems, the Buildings Department (BD) takes enforcement action under the Buildings Ordinance (Cap. 123) (BO), including issuing investigation orders/repair orders/removal orders to owners. In addition, under the Mandatory Building Inspection Scheme (MBIS), the BD also issues MBIS notices on a risk-based approach, requiring owners/owners' corporations to carry out prescribed inspection and repair. If an owner fails to comply with a statutory order/notice without reasonable excuse, the BD will consider instituting prosecution against the owner concerned. In case of emergency or under special circumstances (such as where the owner has deceased, cannot be located, is an elderly, or in the case of "three-nil" buildings, etc), the BD will carry out default works on behalf of the defaulting owners for higher-risk and long-overdue statutory orders/notices, and subsequently recover the cost of works from the owners, together with a supervision charge and a surcharge. Where emergency works are involved, the owners are only required to pay the cost of works and the supervision charge, and the BD will not impose any surcharge.
      
     A reply to the various parts of the question is as follows:
      
(1) Over the past five years, the annual breakdown of the number and classification of default works carried out by the BD is set out at Annex 1.
 
(2) When it is decided to carry out default works on behalf of the defaulting owner(s), the BD will first appoint a consultancy firm and a registered contractor to carry out the necessary investigation/inspection and works, and upon completion of the works, recover the cost of works, supervision charge, and (where applicable) surcharge from the owner(s). After the BD issues a demand note, the owner(s) must settle the amount due within 14 days from the date of issue of the demand note. If the owner(s) fails to make payment on time, the BD will serve a certificate of arrears for registration in the Land Registry, constituting a first charge on the premises to safeguard the Government's interest, and interest at the rate of 10 per cent per annum will be charged on the unpaid amount. If the owner(s) still fails to settle the payment within one month after the registration of the certificate of arrears, the BD will refer the case to the Department of Justice for taking legal action to recover the debt through civil proceedings.
 
     The time required for carrying out default works is affected by various factors, such as the nature, scale, and complexity of the removal/repair/investigation works, whether the owner(s) or occupier(s) concerned are co-operative, and whether any genuine hardship is encountered in carrying out the works. In general, the removal of minor unauthorised building works (UBWs), localised repairs to defective building elements or drainage pipes, and emergency works for removing loose building elements can be completed within one to several days. As for other cases, such as those involving larger-scale repairs, removal of large-scale rooftop UBWs, or arrangements for the decanting/vacating of occupiers, a longer time is required, generally taking from several months to a year and a half from commencement to completion. A small number of complex cases, such as those involving detailed investigation or co-ordination among multiple owners, may take an even longer time.
      
(3) Over the past five years, the annual breakdown of the number of demand notes issued by the BD following the carrying out of default works or emergency works pursuant to the statutory orders/notices mentioned above, the amounts involved, and the amounts successfully recovered are set out at Annex 2.
 
(4) As at September 30, 2026, the BD carried out about 2 500 default or emergency works cases over the past five years, of which the default works costs of about 800 cases had not yet been fully settled, involving about $53 million. The BD has registered the certificates of arrears against the units concerned in the Land Registry as a first charge. The BD does not maintain readily available statistics on the period in arrears.

Special traffic arrangements for Oxfam Trailwalker 2026

     The Police announced today (November 18) that the following special traffic arrangements will be implemented in the New Territories from November 19 to 22 to facilitate the holding of Oxfam Trailwalker 2026. Participants of the event are urged to plan their journeys in advance and to make use of public transport services as far as possible.

A. Road closure

     The following roads will be temporarily closed to all vehicular traffic during specified periods (except emergency vehicles and those with permits issued by the Transport Department):

– The section of Sai Kung Man Yee Road from a point about 3.3 kilometres south of its junction with Tai Mong Tsai Road to a point about 8.3 kilometres south of the same junction will be closed from 6am to 2.30pm on November 20;
– The section of Sai Kung Man Yee Road from its junction with Tai Mong Tsai Road to a point about 3.3 kilometres south of the same junction will be intermittently closed from 7.45am to 2pm on November 20;
– The section of Tai Mong Tsai Road westbound between Pak Tam Chung Physically Handicapped and Able-bodied Site and its junction with Sai Kung Man Yee Road will be intermittently closed from 7.45am to 12.45pm on November 20;
– Parts of the section of Shatin Pass Road between Lion’s Pavilion and Kwun Ping Road will be temporarily closed from 9am on November 20 to 2.30pm on November 21;
– The section of Chuk Yeung Road between Shan Liu and Wong Chuk Yeung will be temporarily closed from 1pm on November 20 to 5.30am on November 21;
– Golden Hill Road will be temporarily closed from 1pm on November 20 to 7.30pm on November 21;
– The section of Tai Mo Shan Road east of its junction with Route Twisk will be temporarily closed from 4pm on November 20 to 1.30pm on November 22; and
– The section of Tsing Ying Road between the vehicular access of Gate 1 of Harrow International School Hong Kong and the gate outside Crossroads Foundation Hong Kong will be temporarily closed from 6pm on November 20 to 1.30pm on November 22.

B. Suspension of parking spaces

     The parking spaces at the following locations will be temporarily suspended:

– All parking spaces (including 23 metered parking spaces and other parking spaces) in the carpark adjacent to Rotary Park, Tai Mo Shan Road will be temporarily suspended from noon on November 19 to 3pm on November 22;
– All parking spaces in the public car park adjacent to Sai Sha Road Barbecue Area Site 4 will be temporarily suspended from 10pm on November 19 to 6.30am on November 21;
– Twenty-seven coach parking spaces in Pak Tam Chung Coach Carpark will be temporarily suspended from 12.01am to 1.30pm on November 20; and
– All parking spaces in the Pak Tam Chung Public Carpark will be temporarily suspended from 12.01am to 1.30pm on November 20.

     The Police will implement appropriate arrangements subject to the prevailing traffic and crowd conditions. Members of the public are advised to exercise patience and tolerance, and take heed of instructions of police officers on site.

LCQ18: Handling of complaints by the Dental Council of Hong Kong

     Following is a question by the Hon Chan Hoi-yan and a written reply by the Secretary for Health, Professor Lo Chung-mau, in the Legislative Council today (November 18):
      
Question:
 
     The Dental Council of Hong Kong (DCHK) is a statutory body established under the Dentists Registration Ordinance. It is responsible for, inter alia, the registration and disciplinary control of dentists and dental care professionals in Hong Kong. My office has recently received successive requests for assistance, in which complainants alleged that after lodging complaints with DCHK, they had waited for a long time without receiving confirmation from DCHK as to whether their complaints had been accepted for further processing. In some of these cases, the complainants have even waited for more than a year, with the complaints still at the stage of consideration by the Chairperson of the Preliminary Investigation Committee (PIC) (initial consideration). In this connection, will the Government inform this Council:
      
(1) whether it knows the respective numbers of cases currently backlogged at DCHK and PIC;
 
(2) whether it knows the current staff establishment of the DCHK Secretariat responsible for handling complaints and the specific duties performed by the relevant staff upon receipt of a complaint;
 
(3) whether it knows, in each of the past five years, the number of complaints received by DCHK and, among such complaints, the respective numbers of those which were decided not to be proceeded with further after initial consideration, those for which PIC decided, after processing, that no inquiry was warranted, and those requiring a formal inquiry after processing;
 
(4) whether it knows, in each of the past five years, the respective average and longest time taken by DCHK to process complaints from receipt of a complaint to the completion of the initial consideration and the PIC stage of the complaint;
 
(5) whether it knows, in each of the past five years, the respective numbers of complaints the handling of which was completed by DCHK, broken down by the time taken to complete the processing, namely, within (i) one year, (ii) one to two years, (iii) two to three years, (iv) three to four years, (v) four to five years, and (vi) more than five years; and
 
(6) whether the Government has any plans to enhance the efficiency and transparency of DCHK in handling complaints; if so, of the details and timetable; if not, the reasons for that?
 
Reply:
 
President,
 
     The healthcare professions in Hong Kong uphold the principle of professional autonomy. The Dental Council of Hong Kong (DCHK) is a statutory regulatory body established under the Dentists Registration Ordinance (Cap. 156) (Ordinance). It discharges various functions in accordance with the law, including handling the registration of dentists and dental care professionals (DCPs), conducting licensing examinations, formulating professional codes and guidelines, and exercising disciplinary regulation over dentists and DCPs registered in Hong Kong. The DCHK has always been committed to upholding the professional conduct and discipline of dentists and DCPs, as well as raising their professional standards, in order to protect the rights and interests of the public and raise public confidence in the dental profession.
      
     Handling complaints against dentists and DCPs is one of the important functions of the DCHK. The DCHK currently has two Preliminary Investigation Committees (PICs) responsible for carrying out investigation into complaints received. Upon receipt of a complaint or information alleging any registered dentist or DCP to have breached the professional code formulated by the DCHK, to have been convicted in Hong Kong or elsewhere of any offence punishable with imprisonment, or to have been involved in other misconduct, the Secretary to the DCHK will, in accordance with the provisions of the Dentists (Registration and Disciplinary Procedure) Regulations, submit the information provided by the complainant to the Chairperson of the PIC for preliminary consideration (initial consideration) to decide whether the case should be proceeded with further. Subsequently, as directed by the Chairperson of the PIC, the Secretary will request the complainant to provide relevant medical records, statutory declarations and other information, etc to assist in the investigation. If the PIC considers there to be sufficient information indicating that the dentist or DCP concerned may have fallen short of the required professional conduct, it will refer the case to the DCHK for holding a disciplinary inquiry.
      
     In response to the question raised by the Hon Chan Hoi-yan, having consulted the DCHK Secretariat, the consolidated reply is as follows:
 
Progress of handling complaints
 
     In the past five years (i.e. 2021 to 2025), the number of complaints received by the DCHK ranged from 160 to 220 each year. As of October 31, 2026, there were 203 complaint cases still being processed by the DCHK.
      
     Between 2021 and 2026 (as of October 31), the DCHK has completed the handling of 980 complaint cases, of which about 70 per cent were completed within one year upon receipt of the complaint, and nearly 95 per cent were completed within three years. Broken down by processing stage, among the 980 cases, 814 cases were decided not to be proceeded with further after initial consideration by the Chairperson of the PIC for being frivolous or groundless; 129 cases were decided by the PIC after consideration that no inquiry was warranted; 31 cases were referred to the DCHK for inquiry with the complaints substantiated; and six cases were found unsubstantiated after inquiry by the DCHK.
      
     Among the above cases, the median time taken from the receipt of a complaint to completing initial consideration was five months; the median time taken from completing initial consideration to the PIC's decision on whether a referral to the DCHK for holding a disciplinary inquiry was required was 17 months; and the median time taken for the DCHK to conduct a disciplinary inquiry was 15 months. Individual cases of a more complex nature might require a longer processing time due to reasons such as the need for complainants to supplement relevant case information and documents, the need for the PIC/DCHK to study relevant medical records in detail, seeking legal advice and the need to seek dental expert reports.
      
     Relevant data are set out in the Annex.
 
Staff establishment of the DCHK Secretariat
 
     The current staff establishment of the DCHK Secretariat is set out below. It also employs four contract clerical staff.  The relevant personnel provide administrative support to the DCHK and assist the DCHK in performing various statutory functions, including handling complaints against dentists and DCPs, such as preparing relevant documents, requesting complainants to provide relevant medical records and statutory declarations as directed by the Chairperson of the PIC, and (if necessary) seeking dental expert reports as directed by the DCHK.
      

Rank Number
Chief Executive Officer 1 (Note)
Senior Executive Officer 2
Executive Officer I 2
Executive Officer II/Hospital Administrator II 2
Clerical Officer 2
Assistant Clerical Officer 1
Total 10

Note: The Chief Executive Officer is the Secretary to the DCHK, who is responsible for supervising the work of the DCHK Secretariat and is concurrently responsible for other duties relating to the Medical Council of Hong Kong and the Boards and Councils Office.
 
Enhancing the efficiency of handling complaints
 
     The Legislative Council passed the amendments to the Ordinance in July 2024, which included amending the composition and structure of the DCHK, allowing the establishment of more than one PIC and the inclusion of lay members in the committee, to ensure the complaint investigation and disciplinary procedures are more efficient and credible, and better protect public interests. Following the legislative amendments, the DCHK has established a second PIC and plans to appoint a second Legal Adviser in early 2027 to assist in handling complaints and providing legal advice. The above measures can help expedite the handling of complaint cases.
      
     In the Chief Executive's 2026 Policy Address, it was announced that the Government will raise the manpower and system support for healthcare professional regulatory bodies. The Department of Health (DH) will increase resources to enhance administrative and professional support for various boards and councils (including the DCHK), including support for the relevant complaint handling systems, to better ensure that the conduct of healthcare professionals meets public expectations. At the same time, the DH will continue to communicate with the DCHK to support the DCHK in enhancing the efficiency and transparency of complaint handling under the existing legal framework, and will review the service quality of the Secretariat as appropriate. Through various measures, including increasing the use of information technology and optimising the organisational structure, the DH will enhance the operational efficiency of the Secretariat to better support the DCHK in performing its statutory functions.

LCQ1: Fatal industrial accidents in the construction industry

     Following is a question by the Hon Lam Chun-sing and a reply by the Secretary for Labour and Welfare, Mr Chris Sun, in the Legislative Council today (November 18):
 
Question:
 
     It is learnt that the construction industry has had the highest number of fatal industrial accidents and the highest accident rate per 1 000 workers among all industries for a long time. In this connection, will the Government inform this Council:
 
(1) of the number of cases that involved construction works lasting less than six weeks or employing not more than 10 workmen among the fatal industrial accidents that occurred in the construction industry in each of the past eight years up to the present; 

(2) of the number of fatal accidents relating to renovation and repair works in each of the past five years up to the present, and the respective numbers and percentages of notifications of commencement of works received by the Labour Department prior to the occurrence of these accidents; and 

(3) given that at a meeting of the Panel on Manpower of this Council in 2021, the authorities proposed amending the Construction Sites (Safety) Regulations to include small-scale construction works involving higher risks within the scope of mandatory notification, of the latest progress of the relevant legislative amendment exercise?

Reply:
 
President,
 
     The Government attaches great importance to occupational safety and health (OSH) for workers. The Labour Department (LD), in particular, keeps close tabs on OSH performance and risk changes in the construction industry, and based on the risk‑based principle, formulates and adjusts the relevant strategies for inspection and enforcement, publicity and promotion, education and training, etc. and launches various measures to strive to improve OSH performance in the construction industry.
 
     My reply to the questions raised by the Hon Lam Chun-sing is as follows:

(1) In the 8-year period from 2018 to 2026 (as at November 4), there were a total of 162 industrial fatalities in the construction industry.  According to the records of the LD, there were 43 fatalities involving construction works completed in less than six weeks or with not more than 10 workmen employed. A yearly breakdown is tabulated in Table 1 of the Annex.

(2) In the 5-year period from 2021 to 2026 (as at November 4), there were a total of 53 industrial fatalities involving repairs, maintenance, alterations and additions (RMAA) works. According to the records of the LD, 24 fatalities (about 45 per cent of the fatalities) involved construction works which had been notified to the LD pursuant to regulation 56 of the Construction Sites (Safety) Regulations (Cap. 59I) prior to the occurrence of the relevant accidents or made known to the LD through other means. The percentage of works that had been notified and had been known to the LD before the accident increased markedly since 2025, and the percentage was about 60 per cent in 2026 (as at November 4). A yearly breakdown is tabulated in Table 2 of the Annex.

(3) As far as resources permit, the LD has continuously strengthened OSH efforts in respect of construction works outside the statutory notification mechanism. Targeting higher‑risk small-scale construction works, such as truss-out bamboo scaffold (TOS) works, the LD updated the "Code of Practice for Bamboo Scaffolding Safety" in 2024, strengthening regulations on TOS works, including requiring workers engaged in TOS works to hold valid certificates issued by the Construction Industry Council (CIC) in order to enhance workers' protection. In addition, the LD drove cross-sectoral collaboration among the scaffolding industry, the insurance industry, the CIC, and the Occupational Safety and Health Council (OSHC) in 2024. This has facilitated the incorporation of the TOS industry into the designated trades under CIC's "Registered Specialist Trade Contractors Scheme". It also paired with the OSHC's "OSH Star Enterprise Schemes" to accredit the safety standards of scaffolding contractors, successfully lowering the insurance premiums for TOS works. This enables employers in the bamboo scaffolding industry to take out employees' compensation insurance at relatively reasonable prices, creating a virtuous cycle that uplifts the overall safety standards of the industry.
 
     In addition, the Property Management Services Authority (PMSA) has been motivating property management companies to engage in the voluntary notification of the erection of TOSs and has revised PMSA's Code of Conduct and Best Practice Guide on Handling Scaffolding Works, specifying that the relevant notification form should be submitted to the LD at least five working days before the erection of TOSs.
 
     The LD launched an online notification platform on February 6, 2026, enabling property management personnel to submit notification forms through either LD's website or mobile application "OSH 2.0", to facilitate the report of the TOS works to the LD by frontline staff. This enables the LD to conduct timely inspections to the TOS works and safeguard workers' OSH.
 
     Since 2023, the number of notifications received by the LD from property management companies has continued to rise significantly. From 2023 to 2025, each year the LD received 3 869, 5 173 and 12 556 notifications respectively; and up to the end of October this year, the LD received a total of 19 876 notifications. It is expected to receive close to 24 000 notifications for the whole year, representing a substantial fifteen‑fold increase compared with 1 576 notifications in 2022.
 
     On the other hand, the Housing Department has been notifying high‑risk RMAA works such as the erection of TOSs to the LD under the existing mechanism and the number of such notification has also been rising in recent years. As of the end of October this year, the LD received 6 799 notifications, doubling the average figure over the past five years, and it is expected to receive close to 8 200 notifications for the whole year, nearly three times the 2 886 notifications in 2022.
 
     Besides, the LD has strengthened communication with owners, owners' corporations, and residents via the community platform of Home Affairs Department (HAD), specifically promoting the safety measures and legal knowledge related to renovation and maintenance works, as well as work-at-height works (including TOS works), in order to enhance the OSH culture and reduce accidents. The HAD has established "Central Platform on Building Management", which holds monthly briefings on building management and related maintenance services/schemes. Since January 2026, the LD has assigned officers to serve as speakers at these briefings and distributed relevant publications on the spot, explaining OSH matters related to building renovation and maintenance works to owners, owners' corporations, property management companies, and residents, and emphasising their legal liabilities for the works as well as the potential legal consequences and losses should an accident occur.
 
     Meanwhile, the LD continues to conduct inspections of small‑scale RMAA works that have short construction periods and involve small workforces.
 
     Overall, the LD has been gathering intelligence on small‑scale RMAA works through various channels and deploying manpower accordingly for inspection and enforcement to curb unsafe practices and safeguard the OSH of workers.

LCQ5: Out-of-service incident of parking meter system

     Following is a question by the Hon Aaron Bok and a reply by the Secretary for Transport and Logistics, Ms Mable Chan, in the Legislative Council today (November 18):

Question:

     In the morning of November 3, 2026, the parking meter system of the Transport Department was out of service, whereby services in multiple districts were affected. In this connection, will the Government inform this Council:

(1) regarding the above incident, whether the Government has thoroughly identified the root cause of the out-of-service incident, such as by looking into the backend central system, network transmission or software update, and of the follow-up actions to be taken; whether the existing smart meters rely excessively on a single central backend or network node such that a single point of failure leads to disabling of the system; whether the Government will arrange an independent technical review to evaluate system resilience;

(2) of the specific indicators for service availability, incident notification time frame and restoration performance under the existing contracts for operation and maintenance of the parking meter system; whether there are improvement plans triggered upon service disruption, terms for continuous optimisation or service performance adjustment mechanisms; and

(3) whether the Government will make a horizontal comparison of the parking meter system with the critical systems for smart city, such as smart lampposts, traffic control and surveillance systems, to examine if there are similar risks of single-point failure, lack of fault isolation or switch-over mechanism to backup system; and whether it will establish standardised benchmarks for evaluating system resilience and include "system architecture redundancy" and "incident recovery capability" as core performance indicators in contracts signed in the future?

Reply:

President,

     The Government attaches great importance to the malfunction incident of the on-street metered parking system of the Transport Department (TD) on the morning of November 3, 2026. Following the malfunction of the system in that morning, the TD immediately instructed the operator to restore the system as soon as possible, and sternly required the operator to conduct a thorough investigation into the cause of the incident and submit a report.

     The reply to the question raised by the Member is as follows:

(1) After jointly reviewing the incident report submitted by the operator, the TD, the Electrical and Mechanical Services Department (EMSD) and the Digital Policy Office (DPO) discovered that the incident was caused by a software update on the system carried out by the operator on the early morning of November 3. The new version of the software programme was defective, preventing the backend system from connecting properly to the parking meters. The TD confirmed with the operator, the EMSD and the DPO that the incident was not attributable to hardware failure, transmission disruption resulting from vandalism, or hacking attacks, nor did it involve any personal or payment data leakage.

     Currently, the backend system, which is connected to about 11 000 parking meters across the territory, comprises two server centres responsible for the parking meters in the urban areas (Hong Kong Island and Kowloon) and the New Territories respectively. After the incident, the operator immediately performed troubleshooting and took remedial actions. Upon emergency repair, the vast majority of the parking meters gradually resumed normal operation from 10.45am on November 3, the day of the incident, and full resumption of normal operation was confirmed at 12.10pm. To ensure the smooth operation of the system, the operator has strengthened its routine real-time monitoring and undertaken daily system health checks. Moreover, the TD has all along commissioned an independent professional third-party organisation to conduct an all-round Security Risk Assessment and Audit (SRAA) covering the entire system, applications, infrastructure and the operational procedures after consulting the EMSD. The TD will carry out the next round of comprehensive SRAA in December 2026.

(2) The existing executed contract between the Government and the system operator sets out a comprehensive service level agreement, which specifies the requirements for the operator's daily operations, malfunction reporting, restoration timeframe and service performance, including an overall service availability of 99 per cent or above for the parking meters, expeditious reporting of major incidents as soon as practicable within 15 minutes and arrival at the scene within 45 minutes, as well as completion of repairing damaged parking meters within three hours of the incident and restoration of the affected system and other components within 24 hours. In the event of system service disruption, the operator is required not only to report the matter, but also to strengthen its hotline manpower to handle public enquiries, and to submit an incident report and proposal for enhancement measures.

     To monitor the service level of the operator and encourage the operator's continuous enhancement, the TD regularly evaluates the performance and service effectiveness of the operator. If the operator is found to fail in providing services in compliance with the contractual provisions, the TD will impose corresponding penalties, including verbal and written warnings, and even financial penalties. At the request of the TD, the operator has arranged to refund the parking meter fees paid by the users during the incident and will compensate the Government regarding the incident. Taking into account of the incident duration, the operator has committed an indemnity of about $1.3 million to the Government.

     To prevent recurrence of malfunction, the TD has collaborated with the EMSD to holistically review the system engineering design and modify the management procedures. The DPO is also involved to provide technical advice. The TD has instructed the operator to implement various measures to step up system monitoring, stringently gatekeep software updates, and introduce high-intensity load tests. The operator has committed to conducting high-intensity load tests in a staging environment that simulates actual operating conditions before rolling out future updates to the system, and exploring the implementation of updates in phases by starting with small-scale trials before proceeding to full implementation, with a view to fostering the resilience of the system at its root.

(3) The Government attaches great importance to the security, stability and resilience of information systems. To this end, the DPO has been providing departments with policy guidelines and technical standards for the operation, maintenance and governance of information systems, covering requirements on project management, system design, system development and testing, system maintenance, information technology (IT) security, system resilience, etc. Departments make reference to relevant guidelines and standards when preparing tender and contract arrangements for IT systems, and implement and manage their IT projects after considering factors including relevant policies, service users, demand for e-services, system operation and resilience, etc.

     The TD's major systems operate independently. Daily traffic monitoring and management are performed using information provided by various systems. The TD, relevant departments and operators monitor the operation of different systems, and each system is equipped with regular monitoring and real-time alert measures, covering hardware conditions, network connections, data and communication volume, system usage, and system maintenance, etc, to enable the relevant departments and operators to detect anomalies in time, thereby promptly handle and respond to the situation. In response to this incident, the TD has reminded the operators of relevant systems to diligently gatekeep software updates, and all-round testing must be conducted before rolling out new systems in actual environment.

     Besides, as regards the smart lamppost project co-ordinated by the DPO, it primarily supports departments in installing and adopting suitable smart devices and sensors according to their operational needs. The smart lampposts and related smart devices operate independently. A failure in an individual lamppost or device generally does not affect the normal operation of other smart lampposts and devices.

     Thank you, President.