Author Archives: hksar gov

Speech by FS at International Forum for Patient Capital (English only) (with photos/video)

     â€‹Following is the speech by the Financial Secretary, Mr Paul Chan, at the International Forum for Patient Capital today (May 22):
 
Clara (Chief Executive Officer of the Hong Kong Investment Corporation, Ms Clara Chan), distinguished guests, ladies and gentlemen,
 
     Good morning.
 
     It is a great pleasure to welcome you all to the inaugural International Forum for Patient Capital, organised by the Hong Kong Investment Corporation Limited (HKIC).
 
     This gathering brings together a remarkable group of global patient capital leaders and enterprises at the forefront of cutting-edge technologies. We are delighted to host you in this dynamic city of opportunities and promise. 
 
The case for patient capital
 
     Technological innovation is the engine of progress, and cutting-edge technologies are its spark. They ignite transformative change, turning bold imagination into world-changing reality. Yet, these frontier innovations often mean navigating uncharted waters. The risks are high, the outcomes are uncertain, and the timelines can be long – though the return could be huge.
 
     This is precisely where and why patient capital plays a critical role.
 
     Grounded in long-term vision, with the courage to weather the ups and downs of economic cycles and the willingness to embrace future possibilities, patient capital is guided not only by profits but more importantly, by purpose and impact.
 
     Around the world, governments and institutions are recognising the strategic importance of patient capital in powering technological advancement, industrial transformation and economic growth.
 
     For instance, our country, China, has emphasised the need to make long-term investments in nascent hard-tech enterprises, supporting deep-tech ecosystems and building new quality productive forces.
 
Hong Kong’s vision and pathway
 
     Here in Hong Kong, we understand the importance of patient capital in our pursuit of a more diversified economic structure with leading-edge competitiveness.
 
     It is our aspiration not only to be a leading international financial, shipping and trade centre, but also a world-class innovation and technology (I&T) hub. Looking ahead, finance, trading and I&T will be the key engines powering Hong Kong’s economic growth
 
     Over the years, we have made substantial investments in the tech sector. We have formulated a comprehensive strategy to expedite I&T development across the entire spectrum. From supporting basic research and the commercialisation of research outcomes, to nurturing start-ups, attracting strategic enterprises and promoting advanced manufacturing, we are scaling the tech ecosystem in Hong Kong from upstream to downstream.
 
     Our edge in innovation is amplified by our synergistic development with sister cities in the GBA (Guangdong-Hong Kong-Macao Greater Bay Area). In fact, the Shenzhen-Hong Kong-Guangzhou science and technology cluster has been ranked second globally by the Global Innovation Index for five consecutive years.   
 
     Our tech ecosystem benefits from a complete and deep funding chain, from angel investments, venture capital, private equity to IPOs. 
 
     However, at times traditional investors are hesitant to enter the early, risky stages of innovation, where potential may be the greatest, yet certainty is the lowest. To address this gap in the funding chain, the Government may need to take the lead.
 
     That is why we established the HKIC. One of its key priorities is to channel market capital into high-potential, nascent-stage industries, and attract innovative enterprises to help us build the related ecosystem in Hong Kong.
 
     The HKIC carries a dual mandate: to enhance the long-term competitiveness and economic vitality of Hong Kong and, at the same time, seek reasonable financial returns over the medium to long term.

     So far, the HKIC has participated in over 100 projects. It has drawn in four dollars of long-term private capital for every dollar it invested.
 
     On the tech front, the HKIC focuses on artificial intelligence (AI), hard tech, biotech, new materials and new energy. These sectors were chosen with strategic ambition. In AI, Hong Kong is home to outstanding academic institutions and uniquely positioned at the convergence of Mainland and international data and talent. In healthcare, we are proud to host two of the world’s top 40 medical schools, and maintain the highest regulatory and professional standards. In green tech, we have more than 300 such start-ups in our Science Park and Cyberport, and many of them are already exporting solutions overseas.
 
     Let me stress one point: the HKIC is not just an investor. It is a co-investor and a collaborator. We work alongside strategic partners to support sectors where we see long-term potential and where Hong Kong has distinct advantages.
 
     HKIC’s vision extends beyond borders. We are committed to supporting regional and global collaboration, guided by the conviction that openness and partnership are the best pathways to sustainable growth and shared success.
 
     I’m sure Clara will talk more about the work of the HKIC shortly.
 
Opportunities ahead
 
     Looking to the future, geo-economic fragmentation has no doubt cast a shadow over global growth and investment flows. But even in fragmentation, opportunities emerge.
 
     As supply chains realign and countries localise critical industries, patient capital can fund scalable alternatives. As technological divides widen, new spaces are open for alternative platforms, creative new entrants and innovative breakthroughs.
 
     A compelling example is the “DeepSeek Moment”. Although start-ups may have a modest and recent beginning, DeepSeek demonstrates how ingenuity, creativity and agility can overcome resource constraints and lead to success on a global scale.
 
     What matters is whether we are willing and ready to support start-ups like them, and provide the capital bridge they need to succeed.
 
Our appeal
 
     That brings us to today’s Forum. More than a dialogue, this event is a platform to connect global patient capital with the transformative ideas and projects that will shape our future.
 
     There is no better place than Hong Kong to host this initiative. 
 
     Under the “one country, two systems” framework, we remain firmly committed to our status as an open, diverse and international city, with free flow of capital, goods, talent and information. We uphold the common law system, underpinned by a judiciary exercising powers independently, with robust intellectual property rights protection. These are the foundations of Hong Kong’s success, and the reasons why we are trusted as a hub for global capital.
 
     We are also committed to working with international partners to chart new and sustainable pathways of growth, and to allow the dividends of innovation to transcend borders and benefit the people.
 
     I am therefore deeply encouraged to see so many leaders of capital and technology coming together today. The conversations you begin here will lead to partnerships, to investments, and to shared progress.
 
     Allow me to conclude by quoting an African proverb: “If you want to go fast, go alone. If you want to go far, go together.”
 
     Ladies and gentlemen, let us go far – together. Thank you very much.

Photo  Photo  
read more

CHP reminds public on precautions against heat stroke during very hot weather

     The Centre for Health Protection (CHP) of the Department of Health (DH) today (May 22) reminded members of the public, particularly those undertaking outdoor activities, to take heed of necessary measures against heat stroke and sunburn in very hot weather.
     
     “The public should carry and drink plenty of water to prevent dehydration while engaging in outdoor activities,” a spokesman for the CHP said.

     “Those engaged in strenuous outdoor activities should avoid beverages containing caffeine, such as coffee and tea, as well as alcohol, as they speed up water loss through the urinary system,” the spokesman explained.

     “Infants and children, the elderly, pregnant women, those with chronic illnesses such as heart disease or high blood pressure, outdoor/manual workers, and individuals who are overweight are more vulnerable to heat stroke. They should pay special attention,” the spokesman added.

     The public should adopt the following precautions:
 

  • Wear loose and light-coloured clothing to reduce heat absorption and facilitate sweat evaporation and heat dissipation;
  • Avoid vigorous exercise and prolonged activities like hiking or trekking as heat, sweating and exhaustion can place additional demands on the physique;
  • Perform outdoor activities in the morning or the late afternoon, if possible;
  • For indoor activities, open all windows, use a fan or use air-conditioning to maintain good ventilation;
  • Do not stay inside a parked vehicle; and
  • Reschedule work to cooler times of the day if feasible. If working in a hot environment is inevitable, introduce shade in the workplace where practicable. Start work slowly and pick up the pace gradually. Move to a cool area for rest at regular intervals to allow the body to recuperate.
     
     â€‹The public should also note the latest and the forecast Ultraviolet (UV) Index released by the Hong Kong Observatory (HKO). When the UV Index is high (6 or above):
 
  • Minimise direct exposure of the skin and the eyes to sunlight;
  • Apply a broad-spectrum water-resistant sunscreen product with a sun protection factor (SPF) of at least 30 or higher when participating in outdoor activities. Reapply every two hours if you need to stay outdoors for a prolonged period, or after swimming, sweating or towelling off;
  • While using DEET-containing insect repellents for personal protection against mosquito-borne diseases, apply sunscreen first, then insect repellent;
  • Seek shade;
  • Wear UV-blocking sunglasses;
  • Wear long-sleeved and loose-fitting clothes; and
  • Wear a wide-brimmed hat or use an umbrella.
    
     â€‹If symptoms develop, such as dizziness, headache, nausea, shortness of breath or confusion, rest and seek help immediately, and seek medical advice as soon as possible.
     
     â€‹The public may obtain more information from the DH’s Health Education Infoline (2833 0111), heat stroke page and UV radiation page; the HKO’s Dial-a-Weather (1878 200), latest weather report and forecast, UV Index and weather information for hiking and mountaineering; and press releases of the Labour Department on precautions against heat stroke for outdoor workers and their employers when the Very Hot Weather Warning is in force. read more

Buildings Department expresses grave concern regarding ICAC’s arrest action at a construction site at Anderson Road

     â€‹The Buildings Department (BD) expressed grave concern today (May 21) regarding the arrests made by the Independent Commission Against Corruption (ICAC) at a construction site at Anderson Road on suspicion of offering and accepting advantages. The BD emphasised that illegal or non-compliant behaviours would not be tolerated. The BD has been actively co-operating with the ICAC’s investigation, including providing information and assisting in evidence collection and enforcement action. As the investigation is still on-going, the BD will not comment on the details of the case.

     The main contractor involved is a registered general building contractor (RGBC) under the Buildings Ordinance (BO). Apart from assisting in the ICAC’s investigation, the BD is also conducting an investigation on the quality of works at the subject site under the BO. The BD received a report in August last year alleging that the steel reinforcements of some structural elements in the superstructure works of six blocks of residential buildings being carried out at the site had not been installed in accordance with the standards under the BO. The BD took the matter very seriously and deployed its staff to the site for inspection four times in September last year. It was found that the number of steel reinforcements installed at some beams was less than that required in the approved plans. The BD thus served an order under section 23 of the BO ordering the cessation of works for the entire site in October last year. The BD subsequently deployed its staff to carry out site inspections on many occasions, conducted interviews and collected project information from the project registered structural engineer (RSE) and registered contractor (RC), including requiring open-up of concrete at various locations of the superstructure works of the six buildings to determine whether the quantity, distribution, position, and size of the steel reinforcements complied with the plans, as well as testing the strength of the concrete.

     The BD has largely completed the concrete open-up investigation. The results of the inspections conducted so far show that there are major deviations in part of the steel reinforcement installation from the approved plans in the six blocks of residential buildings, including positional discrepancy and displacement of steel reinforcements, discrepancy in the size of steel reinforcements, as well as fewer steel reinforcements than those shown in the plans. The BD is currently consulting the Department of Justice in considering prosecution against the relevant individuals based on the evidence in accordance with the provisions of the BO.

     Following thorough inspection and structural assessment by the BD, and considering the scope, quantity, nature of the problematic steel reinforcement works, and the adjoining structures, it has been determined that there is no obvious danger to the overall structure of the buildings. Current inspection results indicate that the quantity of main steel reinforcements within the structural components is, on average, below 10 per cent less than of that in the approved plans. Taking into account the overall configuration of the steel reinforcements and the load-bearing design of the adjacent concrete walls which are sufficient to support the loads, no obvious danger is thus posed to the overall structure. The BD has requested the project RSE and RC to submit an incident report and the necessary remedial measures, including localised strengthening of the buildings, demolition of part of the structural elements where necessary, and reinstalling the steel reinforcements and recasting the concrete.

     In addition to the Anderson Road project involved, the main contractor is currently the RGBC of five other private developments that have not yet been completed. Of these five developments, three are for residential use, one for commercial use and one for commercial/residential use. The commercial/residential project is nearing completion, while the remaining four projects are expected to be completed between the second quarter of next year and the third quarter of 2027.

     In view of the problem of steel reinforcements of the Anderson Road project, the BD has, during the past period, proactively stepped up inspections of the five private developments being undertaken by the main contractor. This includes doubling the number of surprise site inspections and conducting audit checks on the completed concrete structural elements by using non-destructive covermeter testing technology. No deviation in the quantity and position of steel reinforcements from the approved plans, or any obvious structural safety issues, were found. Notwithstanding the above, to ensure building safety, the BD will immediately issue letters to the developers of the five developments, requesting them to urge their appointed RSEs to conduct a comprehensive review of all the supervision records of steel reinforcement installation at the sites concerned; to provide the BD within two months a review report and a testing proposal for checking the steel reinforcement installation; to engage an independent accredited laboratory to conduct the tests according to the testing proposal upon agreement by the BD; and to submit to the BD an independent testing report, so as to ensure the structural safety of the projects. If the developers concerned fail to comply with the BD’s requirements, the BD will consider issuing orders to the authorized persons of the projects under section 22(3) of the BO to require them to carry out the tests deemed necessary by the BD to ensure that the works comply with the relevant requirements. 

     The BD emphasises that this case is a rare individual incident and that the current regulatory system of building works is robust and well-functioning. Under the existing system, registered building professionals (RBPs), RCs, and technically competent persons (TCPs) bear the overall responsibility for supervising building works. They should ensure that all stages of the works are carried out in accordance with the BO and its subsidiary regulations, as well as the approved plans, while ensuring construction safety. If any irregularities in the works are found, the relevant procedures should be initiated to effect rectification. In other advanced regions and cities, including Singapore and the United Kingdom, building design and supervision are also carried out by qualified building professionals and contractors. Under the system, RBPs, RCs, and TCPs monitor each other to ensure that the overall construction process is not compromised by the errors or non-compliance of any single individual. The BD ensures that the relevant parties properly discharge their statutory responsibilities and that the works comply with the standards and regulations through surprise site inspections, audit checks of site supervision records, sampling for verification tests, reviewing test reports, etc. In case of any violations of the BO, the BD will impose sanctions through prosecution, refusal of renewal of registration, and disciplinary actions, while the relevant professional bodies may also consider imposing sanctions.

     The BD will review the experience from this case and double the number of construction sites for audit inspections of the configuration of steel reinforcements prior to the casting of concrete at sites, from the current annual sampling rate of at least 12 per cent to at least 25 per cent of projects. For the configuration of steel reinforcements after the casting of concrete, the BD will also conduct audit checks with an annual sampling rate of 25 per cent of projects as a regularised practice, using covermeter technology for sampling tests to further strengthen the monitoring mechanism. read more