Updated: Table 341 updated.
For enquiries concerning these tables contact:
Anwar Annut
Tel: 0300 068 5060
Email: Anwar.Annut@beis.gov.uk
Mar282013
Updated: Table 341 updated.
For enquiries concerning these tables contact:
Anwar Annut
Tel: 0300 068 5060
Email: Anwar.Annut@beis.gov.uk
Mar282013
Updated: QEP updates.
For enquiries concerning these tables contact:
Novica Petrovic
Tel: 0300 068 5057
Email: Novica.Petrovic@beis.gov.uk
Mar262013
Updated: Updated contact details for Supervising Engineer Panel
As a reservoir owner or operator you are required to appoint a panel engineer for large raised reservoirs, including those classed as ‘high-risk’:
Reservoirs that have been determined as ‘not high-risk’ only need to appoint a construction engineer during the design and construction, restoration or alteration of the reservoir. Supervising and inspecting engineers are not required.
Mar212013
Updated: Updated SR2012 No 11: anaerobic digestion facility including use of the resultant biogas
These rules are available to operators with an anaerobic digestion capacity of over 100 tonnes of waste or a combination of waste and non-waste (both liquid and solids) on any one day.
These rules are also available to operators taking in over 10 tonnes of animal waste, including carcasses, on any one day.
Mar212013
Updated: Added to ‘details’ section: You can apply online for most standard rules environmental permits.
These rules allow you to operate a Part A installation involving the storage, physical treatment and composting of specified biodegradable wastes.
You can apply online for most standard rules environmental permits.