News story: Scottish mine hunter home after three-year tour

Royal Navy mine hunter HMS Penzance returned to her Scottish base of operations today after spending three years helping to protect vital waterways in the Gulf.

Sailing the ship as it made its way up the Gare Loch were Crew 1 from Faslane’s First Mine Counter Measures Squadron (MCM1) who have served with the vessel for the past eight months.

A Royal Navy Sandown class Mine Counter Measures Vessel (MCMV), during her three-years deployed to the Middle East HMS Penzance has spent over 7,500 hours at sea and sailed more than 34,000 miles.

At any one time the Royal Navy has four mine hunters working in the Gulf – two Scottish-based Sandown class ships from HM Naval Base Clyde and two Hunt class vessels which are usually based in Portsmouth.

While there, the vessels conducted routine surveys, sea-bed clearance and mine clearance operations. The ships provide a visible naval presence in the region where stability and good relations with local nations is vital. Much of the UK’s gas, as well as other products, come from the Gulf region and the Royal Navy’s efforts are of vital importance to the UK economy.

Commanding Officer of HMS Penzance, Lieutenant Commander Jim Lovell, said:

The ship has performed everything asked of her during the deployment and I could not be more proud of my Ship’s Company.

A professional and versatile team, they have delivered everything I have asked of them but now it’s time for some very well earned leave.

HMS Penzance left Faslane in June 2014 for service in the Gulf with Crew 1 joining the ship in January 2017- an especially long deployment for the crew of a mine hunter.

While the ships stay on deployment in the region for years at a time, the crews are rotated every six-months or so, flying out to join the vessels.

During their return home, family members and friends gathered at the Faslane dockside to provide an emotional welcome. A lone piper played from the deck of the mine hunter as she berthed alongside while a touch of musical pageantry was provided by the Royal Armoured Corps Band.

It was a particularly special occasion for one member of HMS Penzance’s ship’s company – Petty Officer (Mine Warfare) Mark Titman from Sheffield. As the ship berthed, banners on the deck proclaimed his love for his partner, 32-year-old Laura Campbell from Glasgow, who awaited his return.

First down the gangway, Mark got on one knee to propose to Laura who immediately accepted.

Petty Officer (Mine Warfare), Mark Titman, said:

My daughter, Ava, was born just prior to the deployment and was just four-weeks –old when I left.

I am proud to be able to do my job and even more proud the way that my partner Laura has coped in bringing up our daughter. It leaves me in no doubt whatsoever that she is the perfect women for me!

In January this year, HMS Penzance was one of five Royal Navy vessels who joined forces with the United States, Australia, France and Italy for exercises in the Gulf, testing their expertise in locating underwater explosives.

Working alongside HMS Bangor, HMS Chiddingfold, HMS Daring and command ship RFA Lyme Bay, Penzance helped clear an exercise minefield, making use of unmanned underwater vehicles, divers, helicopters and other specialist equipment in challenging conditions.

More recently the ship and her crew were involved in the disposal of live ordnance off the coast of Cyprus.

At HM Naval Base Clyde to welcome HMS Penzance was Commander Nick Unwin – Commanding Officer of the First Mine Counter Measures Squadron – and the captain who sailed the ship to the Gulf back in 2014.

Commander Unwin, said:

It’s a great moment for me to see Penzance return today after over three-years away from home. I was the Commanding Officer to deploy her to the Middle East region in June 2014 and as the MCM1 Squadron Commander today, it gives me a sense of closure to that whole period.

As a former Commanding Officer, you still have a soft spot for a ship and it’s wonderful to see Penzance back in such good shape. That said, it’s business as usual for the Squadron; HMS Blyth has picked up the baton for the next three-years in the Gulf and HMS Pembroke deployed to a NATO group just last Wednesday.

These small ships are the enduring, forward-deployed British mine countermeasures presence East of Suez and are ready to ensure security of the critical sea lanes we rely upon for our imports and experts and our nation’s economy.

Maritime trade is the lifeblood of the UK economy and industry with 95 per cent of Britain’s economic activity depending on the oceans. Each year the UK imports goods worth £524 billion and without the Royal Navy acting as a deterrent the effect on the economy would be overwhelming.

Commodore Jim Perks, Commodore of the Faslane Flotilla, said:

The crew’s eight month deployment is a significant achievement, not just for the 40 men and women at sea, but also for their families and friends who have supported them so well and missed them so much.

It is not often a crew has the opportunity to bring their ship home as these vessels are worked hard and spend over three years forward-deployed to the Middle East and the Gulf as part of the UK’s presence East of Suez. It is a special moment to see Penzance return and a proud moment for Crew 1.

Their operational tasks have taken them from the Gulf to the Arabian Sea and to the Eastern Mediterranean and they have performed exceptionally well throughout. It’s a job really well done, and now it is time to be with their families.

Record numbers hospitalised after overdosing on heroin and methadone

1 Sep 2017

Miles Briggs Choice

A record number of people were admitted to hospital last year after overdosing on opioids, it has been revealed.

More than 2500 people were hospitalised in 2016, the highest number since 1999 when these particular records began.

It means nearly 50 people a week are rushed to hospital after taking opioid drugs, which are defined as heroin, methadone or opium.

The statistics emerged following a Parliamentary Question by shadow health secretary Miles Briggs.

They follow on from figures last month revealing record drug deaths for opioids, with 776 people losing their life in 2016.

Of the 2507 last year who were admitted after an overdose, 24 died in hospital as a result.

The Scottish Conservatives said these are the latest statistics which show the need for a new drugs strategy north of the border.

The party have repeatedly urged the Scottish Government to get tougher on dealers and suppliers who ruin lives and communities, and find alternatives to methadone for those addicts who want to give up drugs completely.

Scottish Conservative shadow health secretary Miles Briggs said:

“This is the latest set of figures which show the severity of Scotland’s drug problem, which is now the worst in Europe.

“The sheer scale of heroin and methadone use is ruining lives left, right and centre.

“We already knew Scotland was experiencing a drugs deaths rate higher than anywhere else.

“Now we can see the extent of those overdosing on dangerous substances too.

“We need a new strategy urgently to help these vulnerable people beat this lethal habit for good.

“The only crumb of comfort from these statistics is how relatively few deaths occur directly from these overdoses, and we have to thank our hardworking NHS staff for that.”

Tamil Nadu becomes 21st State to join UDAY

Union Minister of State (IC) for Power, Coal, New & Renewable Energy and Mines, Shri Piyush Goyal presided over the signing of the Memorandum of Understanding (MOU) under the Ujwal DISCOM Assurance Yojana (UDAY) Scheme with the Government of Tamil Nadu and its Discom TANGEDCO, for operational and financial turnaround of the DISCOM, in New Delhi today.

Press release: Biggest road upgrade leads the way on environment

The biggest road project currently in construction in the UK is aiming to leave a positive footprint on the local environment once completed by the end of 2020.

People living and travelling in South Cambridgeshire will by now be familiar with the scale of the A14 Cambridge to Huntingdon project just by looking at the great number of yellow lorries and diggers working away along the sides of the existing A14 and A1, and the size of the new structures emerging along the route.

Less obvious but central to the project is the industry-leading care for the environment that the team is delivering while building the new road.

Patrick Howard, ecology lead for the A14 Cambridge to Huntingdon project for Highways England, explains:

An important part of any road construction project is the planning of environmental mitigation so that, by the time a project is completed, its footprint on the surrounding natural environment is as small as possible.

Protecting the environment now and in the future is one of the golden threads that runs through all aspects of the scheme, from design to construction, project management to efficiency and delivering value for taxpayers’ money. !!n What the A14 team is doing in terms of both environmental mitigation and environmentally-minded project management goes well above and beyond the usual requirements. It sets the standard high in terms of reducing the overall impact of a road scheme on the local environment during construction and after the scheme completion.

Pat continues:

We began thinking about the environment at a very early stage in the project, well before construction started.

There are a number of things we have to do by law, like survey the land where the road will be built to assess how the scheme might affect wildlife, or talk to environmental organisations to get their advice and give them the opportunity to feedback on our proposals.

And we have to look after protected wildlife species such as great crested newts, water voles, bats, badgers and a number of birds that breed on the site of the scheme.

But we’ve also decided to build into the project ways to minimise our environmental impact now and to leave a positive legacy for the future.

One of the ecologists at work releasing some of the water voles into their new habitat in August 2017

Initiatives include: creating 271 hectares of new, connected habitats for wildlife, replanting trees at a ratio of two trees planted for every one felled, gathering rare wildflower seeds and specimens to replant after the end of construction, using renewable energy where possible, and making the most of naturally-occurring materials on site to build the road – more can be found in the list of facts below:

Plants and trees

  • Twice as many trees will be replanted which had to be felled to build the road once the project is finished
  • All the vegetation cleared ahead of construction starting, including trees felled, has either been used within the local community or to a biomass facility for energy production locally
  • 866,000 plants from 50 different species will be replanted once the scheme is completed
  • The trees that will be replanted will be in keeping with existing local woodland and include:
    • oak
    • field maple
    • elm
    • hawthorn
    • blackthorn
    • elder
  • A number of rare plant species have been found across the route and have been moved so they can be replanted in the same area along the road verges once the scheme is finished. These include bee orchids, common spotted orchids and slender tare – a rare wildflower found near Girton.

Wildlife

  • Ecologists working on the project are caring for a range of protected species along the route including:
    • great crested newts
    • water voles
    • bats
    • breeding birds such as yellow wagtail, skylark, corn bunting and yellowhammer
    • badgers
  • Overall, the scheme will build 1.05 square mile (271ha) of new wildlife habitat across 18 areas around the new road, connecting them where possible to help wildlife move more freely than is currently possible. That’s the equivalent of 269 rugby fields.
  • More than 200 bat boxes are being installed to provide additional habitat and help bats during migration.
  • 5 barn owl boxes have been installed already and more will be installed by the end of the project. All of the ones currently up have been used for nesting this year and 3 of the birds have successfully reared chicks.
  • Two bird species, the grasshopper warbler and Cetti’s warbler, will benefit from additional, newly created habitat
  • New habitats are being created at 3 different locations along the scheme for water voles, Britain’s fastest declining wild mammal. The 10 water voles being re-located to their new Alconbury home moved all in over the summer.
  • Once the scheme is complete, boxes for kestrels will be installed to nest around borrow pits and balancing ponds.
  • Activity around 5 badger setts is being monitored along the route and the team is in the process of deciding how best to help the badgers relocate so they are not disturbed or endangered by the new route.
  • The team is trapping great crested newts and relocating them at a safe location until the scheme is complete, and will create 3 new habitats for them when the scheme is closer to completion.
  • Hedges with native species found in the local area will be planted near Brampton woods to create corridors and food sources for recently reintroduced dormice.

Energy, water and construction materials

  • The project team is trialling hybrid generators, solar powered lights and hydrogen powered vehicles throughout site in an effort to reduce our use of fossil fuels.
  • 100% of the energy used across the project compounds comes from renewable energy sources including wind and solar powers.
  • Only non-drinking water is being used for construction purposes so as to minimise the impact on the local drinking water supply. The water comes from water treatment plants, the scheme’s borrow pits, and local watercourses (up to a maximum of 20m3 per day).
  • Instead of having to source externally the 5 million tonnes of materials needed to build the new road, more than half of it is being supplied from the site itself through borrow pits within site. The project also has onsite concrete batching plants to create the building blocks for the scheme’s 34 bridge and other structures. This means less long-distance transport needs and less energy used. It also means less impact on the busy road network locally.

Work on building the £1.5bn upgrade to the A14 between Cambridge and Huntingdon started in November last year. The project includes widening a total of seven miles of the A14 in each direction (across two sections), a major new bypass south of Huntingdon, widening a three-mile section of the A1 and demolition of a viaduct at Huntingdon, which will support improvements in the town.

For the latest information about the A14 Cambridge to Huntingdon improvement scheme, visit the project page, follow @A14C2H on Twitter and like our Facebook page.

General enquiries

Members of the public should contact the Highways England customer contact centre on 0300 123 5000.

Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.