Detailed guide: Discharges to surface water and groundwater: environmental permits

image_pdfimage_print

Updated: The ‘Decisions about your permit’ section has been updated to: ‘You will normally get a decision on your application within 4 months.’ This is because 4 months is the statutory determination period in the Environmental Permitting Regulations 2016.

You may need an environmental permit if you discharge liquid effluent or waste water (poisonous, noxious or polluting matter, waste matter, or trade or sewage effluent):

  • into surface waters, for example, rivers, streams, estuaries, lakes, canals or coastal waters (known as water discharge activities)
  • onto or into the ground, for example, land spreading waste sheep dip, or discharging treated sewage effluent to ground via an infiltration system (known as groundwater activities)

You need to apply to the Environment Agency for a permit for any standalone water discharge or groundwater activity – standalone means the activity is not part of a waste operation, installation or mining waste operation.

If your water discharge is part of one of these operations, you can make the discharge part of your installation permit or waste or mining waste permit.

You’re breaking the law if you operate without a permit if you should have one.

When you do not need a permit

You do not need a permit:

  • to discharge uncontaminated water, for example, clean rainwater from roofs or small areas of hardstanding to surface water
  • to discharge uncontaminated water collected from public roads and small parking areas (that’s been through a maintained oil separator or sustainable urban drainage system) to surface water
  • for certain low-risk groundwater activities, known as groundwater activity exclusions

For more information about the Environment Agency’s position on protecting groundwater, see Groundwater protection position statements. Position statement G12 on page 29 explains when you do not need a permit for discharge of clean roof water to ground.

Discharges in sewered areas

You should discharge your waste water to the public foul sewer whenever it’s reasonable to do so. You do not need an environmental permit to do this.

You must consult your sewerage undertaker before you:

  • make a new connection to the public sewer
  • discharge anything other than domestic sewage

Permits in sewered areas

The Environment Agency will not give you a permit for a private sewage treatment system if it’s reasonable for you to connect to the public sewer.

If the distance from the boundary of your site to the nearest public sewer is less than the number of houses multiplied by 30 metres, you must show the Environment Agency why it’s not reasonable to connect to the public sewer. In some cases, we may ask you to consider connecting to the public sewer if it’s more than the number of houses multiplied by 30 metres away. Contact the Environment Agency to discuss your proposal before you apply for a permit. You will need to:

  • tell us how much it will cost to connect to the nearest public sewer
  • give us a formal response from your sewerage undertaker
  • tell us the cost of the private sewage treatment system you want to use

When we assess whether it’s reasonable for you to connect to the public sewer we take into account:

  • the comparative costs of connecting to public sewer and installing a private sewage treatment system
  • any physical barriers that would prevent you connecting to the public sewer
  • any environmental benefits that would arise from installing a private sewage treatment system such as the reuse of of treated effluent

If you’re planning a new development, plan your foul sewerage at an early stage and consult with the local authority and sewerage undertaker.

We will not normally give you a permit if you want to use a private sewage treatment system because there’s not enough capacity in the nearest public sewer. If necessary, you must agree improvements to the existing sewerage network, in order to allow connection, with the sewerage undertaker. These improvements must be put in place before the development is occupied. This aligns with planning practice guidance and the building regulations.

Disputes over connection to the public sewer

Your sewerage undertaker may have a duty to provide a first time sewerage scheme if:

  • your existing sewerage system is causing or is likely to cause an adverse effect on the environment or amenity which cannot be solved by repair or maintenance
  • the new system will serve more than one property
  • providing a public sewer is the most appropriate solution

Check the guidance for your activity

Your water discharge or groundwater activity may meet the conditions for an exemption from environmental permitting or a standard rules permit. For more information read the relevant guidance for:

You’ll need to apply for a bespoke permit if none of the above apply to you.

Contact the Environment Agency if you’re not sure if you need a permit.

Type of waste water: domestic sewage or trade effluent

As part of your permit application, or to know whether your activity qualifies for an exemption, you will need to classify your waste water. Read more about when your waste water is classed as domestic sewage.

Standard rules permits for package treatment plants

You may be able to apply for a standard rules permit if you operate a package treatment plant for secondary treatment of domestic sewage.

Your package treatment plant must discharge between 5 and 20 cubic metres of domestic treated sewage to surface water daily (for example, your plant treats sewage from a small hotel or bed and breakfast, not a single household). If your sewage discharge to surface water is less than 5 cubic metres per day and you meet the general binding rules, you do not need a permit.

Your operation must meet the description and rules, but:

  • you cannot change (vary) the rules and you have no right of appeal against them
  • if you want to change your operations and so will not meet the criteria of the standard permit anymore, you’ll have to apply to make it a bespoke permit instead
  • if there’s a change in your local environment after your permit has been issued (for example, a change in the definition of a groundwater source protection zone), you may need to apply to change your permit

Applying for a standard rules permit is usually quicker than a bespoke permit. If you do not meet the conditions for the standard rules permits you must apply for a bespoke permit.

Apply for a standard rules permit

Before you apply for a standard rules permit you need to:

Standard rules permits: application forms

Download and fill in these forms:

Send your completed forms and application fee to PSC-WaterQuality@environment-agency.gov.uk or post them to:

Environment Agency Permitting and Support Centre

Environmental Permitting Team

Quadrant 2

99 Parkway Avenue

Parkway Business Park

Sheffield

S9 4WF

Find out about:

Before you apply for a bespoke permit

You need to:

If you’re a water company or NAV (new appointments and variations) you must follow the guidance relevant to your activity:

Specific substances assessment

When you apply for a permit you’ll need to tell the Environment Agency if your discharge will contain specific substances.

If your discharge contains specific substances your risk assessment will need to include a specific substances assessment.

Find the list of surface water specific substances in the surface water pollution risk assessment guide.

For discharges to groundwater, a specific substances assessment is needed for hazardous substances and non-hazardous pollutants. This does not include discharges that only contain or are only likely to contain ammoniacal nitrogen, ammonium and suspended solids. Find the list of hazardous substances and non-hazardous pollutants for groundwater on the Water Framework Directive UK TAG website.

Apply for a bespoke permit

Standalone water discharge and groundwater activity permit (not open-loop heat pump systems)

Download and fill in forms:

Open-loop heat pump systems

Download and fill in forms:

Standalone groundwater discharges with spreading activities permit

Download and fill in forms:

Send your application

When you send your application you’ll need to include:

  • the relevant forms
  • the summary of your management system
  • your risk assessment if you’ve been required to do one
  • any other supporting documents mentioned in the form guidance, for example, site maps and plans
  • your fee

Email your completed forms to PSC-WaterQuality@environment-agency.gov.uk or you can post them to:

Environment Agency Permitting and Support Centre

Environmental Permitting Team

Quadrant 2

99 Parkway Avenue

Parkway Business Park

Sheffield

S9 4WF

Get help with your application

The Environment Agency offers basic pre-application advice to help you complete your application. This basic advice is free as the cost of providing it is included in the application charge.

For standard rules and bespoke permits the basic service covers the following advice (where applicable):

  • which standard rules set is relevant for your activities
  • helping you check that your activity meets the criteria for a standard rules permit
  • carrying out nature and heritage conservation screening
  • which applications forms and guidance to use
  • information about any administrative tasks the Environment Agency will need to do

For bespoke permits, the basic service also includes advice about risk assessments you may need to do to accompany your application.

If you need more in depth advice about your application the Environment Agency offers an enhanced pre-application advice service. The enhanced service costs £100 an hour plus VAT. It can include face to face meetings and advice on:

  • complex modelling
  • preparing risk assessments
  • parallel tracking complex permits with planning applications
  • specific substances assessments
  • monitoring requirements (including baseline)

The Environment Agency will give you a written estimate before it starts work. This will include:

  • a breakdown of the work it will carry out with costs
  • when these costs will be charged

Getting pre-application advice will help you submit a good quality application that can be processed (determined) smoothly and quickly. Complete the pre-application advice form if you want to request either basic (free), or enhanced (chargeable), pre-application advice.

If you cannot access the form please contact the Environment Agency. It will send you a paper copy to complete and return.

You must be the ‘legal operator’ of the water discharge or groundwater activity that you want a permit for.

This means you must have sufficient control of the activity, for example you:

  • have day to day control of the activity, including the manner and rate of operation
  • make sure that permit conditions are complied with
  • decide who holds important staff positions and have incompetent staff removed if required
  • make investment and financial decisions that affect the performance or how the activity is carried out
  • make sure that regulated activities are controlled in an emergency

You can have contractors carry out activities at your site and remain the operator if you continue to have sufficient control of the activity. But sometimes a contractor may be the legal operator or become the legal operator, based on the tests set out above. A remote holding company is unlikely to have sufficient control.

If you’re no longer the operator you must formally transfer the permit to the person who is the operator. If you continue to operate an activity when you’re no longer the legal operator the Environment Agency may take enforcement action against you or revoke the permit.

You must apply as a ‘legal entity’ that can be legally responsible for the permit and can accept liability, for example:

  • an individual
  • public limited company
  • private limited company
  • government body (for example, local authorities, NHS Trusts, Food Standards Agency)
  • limited liability partnership

As the operator you’re legally responsible for the activity whether or not it’s in operation.

Your application can be refused if the Environment Agency does not consider you to be the operator or a legal entity.

Joint operators of one activity

If your activity has more than one operator acting together, you need to make one joint application for all the operators. For example if several people jointly operate a treatment plant then they would all be named on the permit.

Keep sensitive information confidential

When the Environment Agency consults on your permit application it will let people see the information in your application.

You can ask the Environment Agency not to make public any information that is commercially sensitive for your business (for example, financial information). You can do this by including a letter with your application that gives your reasons why you do not want this information made public.

The Environment Agency will email or write to you within 20 days if it agrees to your request. It will let you know if it needs more time to decide.

If it does not agree to your request it will tell you how to:

  • appeal against its decision
  • withdraw your application

Fees and charges

You must pay a fee to apply for a permit.

You must send your fee with your application. If your application’s successful, the Environment Agency normally charge you an annual ‘subsistence’ fee while you have a permit. This fee depends on your activity and the type of permit you have.

Find out more about fees and charges. You can contact the Environment Agency for help to work out your fee.

After you apply

The Environment Agency may reject your application if, for example:

  • you have not used the right forms
  • you’ve forgotten to include the fee or sent the wrong fee
  • you have not provided important information

Once the Environment Agency has the information it needs to start assessing your application, it will contact you and tell you that your application is ‘duly made’. This means it’s starting the assessment process. It may still request more information if it needs it to complete its assessment.

Consultations on your permit application

The Environment Agency will publish online a notice of your application and instructions for how other people can see and comment on it.

Members of the public and anyone interested in the application have 20 working days to comment.

The Environment Agency may also consult other public bodies, for example, local authorities, Public Health England, water companies and Natural England.

If the Environment Agency considers your application to be of high public interest, it may:

  • take longer to give you a decision
  • carry out an extra consultation on the draft decision
  • advertise the application more widely

The Environment Agency’s public participation statement explains how and why it will consult on permit applications.

Decisions about your permit

The Environment Agency will write to you to tell you its decision about whether or not it can allow what you’ve asked for.

You will normally get a decision on your application within 4 months. The Environment Agency will tell you if your application will take longer.

You can appeal if it refuses your application or if you’re not happy with the conditions it has put into your permit. Its decision letter will explain how you can appeal.

The Environment Agency will publish the decision on its public register.

The Environment Agency will not normally change your permit within 4 years of it being issued. However, it may change your permit if:

  • you do not meet your permit conditions or environmental standards
  • there are changes to legislation

Comply with your permit

After you’ve been granted your permit you’ll need to comply with its conditions.

Find out how the Environment Agency will regulate you when you start operating.

Change, transfer or cancel your permit

After you have your permit, you can:

  • change (vary) the details on it
  • transfer it to someone else
  • cancel (surrender) it

Find out how to change, transfer or cancel your permit.

Contact the Environment Agency

Contact the Environment Agency if:

  • you need help with your application
  • you’re not sure if you need a permit

General enquiries

National Customer Contact Centre
PO Box 544
Rotherham
S60 1BY

Monday to Friday, 8am to 6pm

Form: Capital grant application form: Countryside Stewardship

image_pdfimage_print

Updated: Updated application form, annex 2 woodland creation and how to complete form guide. Removed annex 1 as hedgerows and boundaries grant is closed for applications.

Use the capital grant application form with:

(Annex 1 removed as hedgerows and boundaries grant is closed for applications.)

If you do not have management control over all or part of the land included in the application for the full length of the potential agreement, you also need to complete a land ownership and control form.

For woodland creation grant applications on common land or land with shared grazing, you also need to complete a common land and shared grazing supplementary application form.

Online applications

You can use the Rural Payments service to apply for a woodland management plan grant. You do not need to complete the application form and annex if you use the online service.

Update: air strikes against Daesh

image_pdfimage_print

Published 29 January 2016
Last updated 13 October 2022 + show all updates

  1. Update: RAF Reaper strike on Daesh terrorist in Iraq

  2. Update: RAF Reaper strike on Daesh terrorists in Iraq

  3. Updated strike statement

  4. Updated on Saturday 27 November.

  5. Updated strike statement

  6. Added content under useful information heading.

  7. Updated Strike Statement

  8. Updated strike activity.

  9. Update on latest strikes

  10. Updating strike statement

  11. Updated strike statement

  12. Updated strike statement

  13. Updated air strikes

  14. We are updating with new strikes information

  15. Updated strike statement

  16. Updated strikes

  17. Updated strikes

  18. Updated detail on airstrikes against Daesh

  19. Updated strike

  20. Updated strikes

  21. Updated strikes

  22. New strikes

  23. Updated strikes

  24. Updated strikes

  25. Update to strikes

  26. Updated strikes

  27. Fresh strikes

  28. Updated strikes

  29. Updated strieks

  30. Updated with new strikes

  31. Update

  32. Updated with new strikes.

  33. Updated strike statement.

  34. Updated strikes

  35. Update

  36. Update to strikes

  37. Update to strikes

  38. Updated Friday 25 May 2018

  39. Update on strikes

  40. Update to strike.

  41. Update to strikes

  42. Updated 13 February 2018

  43. reformatted

  44. Reformatted

  45. Updated 23 January 2018

  46. Update to strike statement

  47. Update.

  48. Updated 11 December 2017

  49. Update to strikes

  50. Update to strikes

  51. Update to strike statement

  52. Update to strike statement

  53. update to strike statement

  54. Update to strike statement

  55. Update to strike statement

  56. Update to strike statement.

  57. Update to strike statement.

  58. Update to statement

  59. Update to strike statement.

  60. Update to strike statement.

  61. Updated strike statement.

  62. Update to strike statement.

  63. Updated strike statement.

  64. update

  65. update

  66. update

  67. update

  68. update

  69. Strike update

  70. Strike update

  71. Strike update.

  72. update

  73. update

  74. update

  75. update

  76. update

  77. update

  78. update

  79. update

  80. update

  81. update

  82. update

  83. update

  84. update

  85. update

  86. Latest strike update

  87. Latest strike update

  88. update

  89. update

  90. update

  91. update

  92. update

  93. update

  94. update

  95. update

  96. Latest strike update

  97. update

  98. update

  99. latest update

  100. Updated strike update.

  101. update

  102. Latest strike update.

  103. Update

  104. Updated with video.

  105. Updated information on air operations against Daesh.

  106. update

  107. update

  108. Video added

  109. update

  110. update

  111. Update

  112. update

  113. Update

  114. Update

  115. update

  116. Update

  117. update

  118. change to caption

  119. Update

  120. update

  121. Update

  122. update

  123. updated

  124. update

  125. Update

  126. Update

  127. Update

  128. Amended to reflect latest strike update.

  129. Amended to provide the most recent update.

  130. update

  131. Operational update

  132. Updated strike statement

  133. Operational update

  134. update

  135. Strike update

  136. update

  137. Strike update

  138. Update

  139. Operational update.

  140. Strike update

  141. Strike update

  142. Operational update.

  143. Operational update.

  144. Operational update.

  145. Operational update.

  146. Operational update.

  147. Operational update

  148. Operational update.

  149. Operational update

  150. Operational update

  151. Operational update

  152. Operational update.

  153. Operational update

  154. Operational update

  155. Operational update.

  156. Operational update.

  157. Operational update

  158. Operational update

  159. Operational update.

  160. Operational update

  161. Ou.

  162. Operational update

  163. Operational update

  164. Operational update.

  165. Operational update

  166. Operational update

  167. Operational update

  168. Operational Update

  169. Operational update

  170. Operational update

  171. First published.

News story: Update: air strikes against Daesh

image_pdfimage_print

Updated: Updated with new strikes.

Summary

• Monday 15 October – Tornados destroyed a Daesh observation post in eastern Syria.
• Wednesday 17 October – Tornados demolished another terrorist observation post in eastern Syria.
• Sunday 21 October – Typhoons struck a Daesh strong-point which was firing at the Syrian Democratic Forces.
• Monday 22 October – Tornados bombed a base for a terrorist improvised explosive device team in eastern Syria.
• Wednesday 24 October – Tornados destroyed an armed truck, and two strong-points which were firing at the Syrian Democratic Forces.
• Friday 26 October – Tornados bombed a further two strong-points with which the Syrian Democratic Forces were engaged in a firefight.
• Sunday 28 October – a Reaper attacked a group of terrorists caught in the open in eastern Syria, whilst Typhoons collapsed the entrance to a cave containing stockpiled weapons in northern Iraq.

Detail

Royal Air Force aircraft have continued to provide support to the Syrian Democratic Forces’ operations against the last significant pocket of Daesh-held territory in the Euphrates valley of eastern Syria. On Monday 15 October, two Tornado GR4s were tasked with the destruction of a terrorist observation post which had been identified to the south-east of Hajin. A single Paveway IV guided bomb was released and this scored a direct hit on the observation post, destroying it. A further such observation post was identified to the north-east of Abu Kamal on Wednesday 17 October, and was again dealt with effectively by a Paveway attack delivered by a Tornado flight. As normal, the Tornados were supported by a Voyager air refuelling tanker, based alongside them at RAF Akrotiri.

Typhoon FGR4s provided further support to the SDF on Sunday 21 October. That evening, an SDF advance came under fire from a Daesh strong-point some five miles north-east of Abu Kamal. The Typhoon flight conducted a carefully planned attack with a single Paveway IV, which struck the strong-point and immediately eliminated the threat to the SDF.

Intelligence identified a small building north-east of Abu Kamal as a base for terrorists planting improvised explosive devices. Two Tornados carried out an attack with a Paveway IV on Monday 22 October, which destroyed the target and caused a number of secondary blasts as the explosives inside detonated. On Wednesday 24 October, another Tornado flight provided further close air support to the SDF in the same area. Our aircraft struck a truck, armed with a pair of anti-aircraft guns, with a Paveway; the attack also accounted for a number of terrorists close to the vehicle. The SDF then encountered two successive Daesh strong-points, both of which engaged the SDF at short range. Despite the proximity of the SDF to the two targets, the Tornados were able to strike both of the terrorist positions with Paveway IVs.

Despite very challenging weather, Tornados again supported the SDF north-east of Abu Kamal on Friday 26 October. The SDF reported being in close combat with Daesh positioned in two strong-points. The Tornados had to bomb through cloud, unable to see either the target or the friendly forces close by, but the SDF reported both targets to have been hit accurately by the Paveway IVs. On Sunday 28 October, a Reaper conducted armed reconnaissance over the Abu Kamal area, and carried out a successful attack with a Hellfire missile, striking a group of terrorists spotted manoeuvring through fields. In northern Iraq, a Daesh stockpile of weapons had been identified in a set of caves on a hillside thirty miles north-west of Kirkuk; a Typhoon flight was able to collapse the entrance to the caves using Paveway IVs.

UK contribution to the fight against Daesh

Map of UK forces committed to Operation Shader
Map of UK forces committed to Operation Shader

Campaign against Daesh

Map of Daesh losses and gains in Iraq and Syria since September 2014
Map of Daesh losses and gains in Iraq and Syria since September 2014

Previous update

With the Syrian Democratic Forces continuing their offensive against the last major pocket of Deash-held territory in eastern Syria, centred on Hajin, Royal Air Force aircraft have provided further intensive support. As in the previous month, a particular focus has been on terrorist positions north-east of Abu Kamal. On Wednesday 3 October, an RAF Reaper detected a Daesh mortar which was firing on SDF forces a short distance away. Two RAF Tornado GR4s were also on task in the area, and they struck the mortar position with a single Paveway IV guided bomb.

The following day, an SDF attack on a Daesh position encountered a truck-bomb which was blocking their advance towards a terrorist strong-point in a nearby building. Tornados destroyed the truck-bomb using a Brimstone missile, then demolished the strong-point with a Paveway IV. Another building in the area was then identified as not only Daesh-held, but a probable facility for further improvised truck-bombs. This target was also destroyed with a Paveway IV.

On Friday 5 October, Typhoons bombed a Daesh command post north-east of Abu Kamal using two Paveway IVs. Nearby, a flight of Tornados supported the SDF, who had come up against a Daesh-held compound. The SDF were very close to the target, but careful coordination allowed the Tornados to strike the two key buildings within the compound with Paveway IVs. A Reaper provided further support in the same area on Saturday 6 October, and an attack delivered with a GBU-12 guided bomb successfully disrupted firing by Daesh on the SDF. Typhoons and Tornados were working further north, near Hajin, and used Paveway IVs and a Brimstone missile to deal with four Daesh mortar positions and a weapons stockpile.

A Reaper’s crew successfully targeted Daesh fighters who had positioned themselves beneath trees in the Hajin area on Sunday 7 October, hitting them with a Hellfire missile. Closer to Abu Kamal, Typhoons meanwhile destroyed a terrorist command post.

Despite bad weather, our aircraft were able to provide effective close air support to the SDF at both the northern and southern ends of the Hajin pocket on Thursday 11 October. North of Hajin, a flight of Typhoons and a flight of Tornados used Paveway IVs to destroy three Daesh-held buildings which the SDF had encountered. In the south, close to the border with Iraq, a second pair of Tornados bombed two groups of terrorists spotted in in the open; one of the attacks also destroyed the extremists’ vehicle.

A Daesh armed truck was spotted north-east of Abu Kamal on Friday 12 October, and was destroyed by a direct hit from a Paveway IV dropped by a Typhoon flight. A pair of Tornados conducted one attack through thick cloud, striking a tunnel – again to the north-east of Abu Kamal – then delivered a second successful attack with two Paveways against a Daesh-held building near Hajin. On Saturday 13 October, Typhoons bombed a Daesh strong-point north of Hajin, whilst Tornados struck a second such defensive position north-east of Abu Kamal. The Tornados also attacked a mortar position and a Daesh command post in the same area, using Paveway IVs.

Our aircraft were able to attack successfully three known terrorist command and control locations on Sunday 14 October, all in and around Hajin. Typhoons dealt with two of the targets, including one where a Daesh attack planning team were reported to be present at the time, whilst Tornados destroyed the third.

Details of previous airstrikes can be found here.

For more information see Daesh: UK government response page on GOV.UK