Green Party reaction to government go ahead for Sizewell C nuclear power plant

image_pdfimage_print

29 November 2022

Responding to the government’s decision to give the go ahead to the Sizewell C nuclear power plant in Suffolk [1], Green Party co-leader Adrian Ramsay said:

“This is an ideological decision driven by a misguided energy policy. It is clear there are cleaner, quicker and much less expensive options to meet our electricity needs. Investment in renewable energy and insulation at scale are what is needed to tackle both the climate emergency and cost of living crisis with the urgency needed. 

“The design of Sizewell C will follow the much criticised Hinkley Point C scheme in Somerset which has been delayed by years and beset by technical difficulties and mushrooming costs. It is clear that large nuclear reactors are far too slow to help solve our climate crisis and way too expensive to address sky-high energy bills.”  

Notes

1.  https://www.theguardian.com/business/2022/nov/29/sizewell-c-nuclear-plant-confirmed-edf-suffolk-jobs-uk 

Back to main news page

Adblock test (Why?)

Leave a Reply

Your email address will not be published.