Notice: GL4 3BW, Unilever UK Limited: environmental permit issued

The Environment Agency publish surrenders that they issue under the Industrial Emissions Directive (IED).

This decision includes the part surrender notice, decision document and site condition report evaluation template for:

  • Operator name: Unilever UK Limited
  • Installation name: Gloucester Ice Cream Factory
  • Permit number: EPR/AP3530KM/S004



Notice: WA1 4BA, Cape Environmental Services Onshore Limited: environmental permit application advertisement

The Environment Agency consults the public on certain applications for waste operations, mining waste operations, installations, water discharge and groundwater activities. The arrangements are explained in its Public Participation Statement

These notices explain:

  • what the application is about
  • how you can view the application documents
  • when you need to comment by

The Environment Agency will decide:

  • whether to grant or refuse the application
  • what conditions to include in the permit (if granted)



Notice: PE28 3BS, Envar Composting Limited: environmental permit application advertisement (EPR/GP3930DF/V003)

The Environment Agency consults the public on certain applications for waste operations, mining waste operations, installations, water discharge and groundwater activities. The arrangements are explained in its Public Participation Statement

These notices explain:

  • what the application is about
  • how you can view the application documents
  • when you need to comment by

The Environment Agency will decide:

  • whether to grant or refuse the application
  • what conditions to include in the permit (if granted)



Press release: Residents invited to Burton-upon-Trent flood scheme drop-in events

Burton-upon-Trent residents will have a chance to learn more about the benefits of the Environment Agency’s multi-million pound flood scheme improvement work at a series of drop-in sessions next month.

The planned works to the town’s flood defences will see upgrades to the 9km of existing defences that already protect more than 7,000 homes and businesses in the town. The work will also see a further 3,358 properties benefit from increased protection.

The work is due to start in early 2019, with a completion date in early 2021 and will enable further transformation of the town centre to allow it to become more sustainable.

Drop-in sessions are being held at a number of locations across the town where Environment Agency staff will be on hand to discuss the scheme as well as to spread awareness about the need to be more flood resilient.

Mark Swain, who heads the Environment Agency’s Staffordshire flood risk team, said:

These sessions are a really important means for us to explain our work as well as to listen to residents. We would really like as many people as possible to attend one of our sessions so that they can discuss the exciting plans we have in place for Burton.

Sessions are being held as follows:

  • Monday 6 November (5pm to 7pm) – Branston Golf Club pavilion
  • Tuesday 7 November (5pm to 7pm) – Riverside Hotel
  • Thursday 9 November (11am to 2pm) – Burton Library
  • Thursday 9 November (3pm to 6pm) – Meadowside Leisure Centre
  • Monday 13 November (5pm to 7pm) – Tesco, St Peter’s Bridge



Press release: Enforcement Undertaking agreed with Anglian Water

An enforcement undertaking (EU) has been agreed with Anglian Water after the company polluted Houghton Brook, Cambridgeshire with sewage.

Around 150 fish died when sewage from Ilex Road Pumping Station in St Ives was pumped into the water system for 10 hours via the emergency overflow.

The overflow was mainly caused by excessive levels of un-flushable material/rag blocking the pump, which was a known issue at the works. Contributing factors included a second pump being out of service during the incident and the failure of an alarm.

At the time of the pollution the water company tankered the watercourse to prevent pollution travelling further downstream and 2 days later the stream was running clear.

Anglian Water has since replaced equipment at the pumping station including a pump that can better cope with high levels of rag.

The Environment Agency accepted the offer by the water company to put right any damage caused by the pollution and to donate to an environmental charity.

Environment to benefit

As part of the EU, Anglian Water has donated £100,000 to the Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire to benefit the local environment and also paid the Environment Agency’s costs.

Jeremy Hay, Environment Agency officer, said:

Enforcement undertakings allow those who commit offences to restore the environment and to take steps to prevent a recurrence.

When appropriate, they allow a quicker resolution than a prosecution and help offenders who are prepared to take responsibility for their actions to put things right voluntarily working with their local communities”.

Formal sample results taken after the incident in September 2014 showed that sewage had polluted approximately 635m of the stream.

The EU was offered in relation to an offence of pollution under section 4 of the Salmon and Freshwater Fisheries Act 1975.

It was accepted in March 2017 and the undertaking was completed on 30 May 2017.